Outdoor VCB

Outdoor VCB

ZW7 Vacuum Circuit Breaker

Storage, making and breaking by motor, It can operating by handle.<br>Breaking short-circuit current up to 25kA.<br>Mini motor spring mechanism (about 30W).<br>Installation method: adopt two type installation method.<br>Sealing performance: adopt reliable sealing technical.<br>Incoming & Outgoing method:adopt silicon bushing to make enough insulate distance<br>Safe operating: there is an equipment to protect explosion.

Specifications

Type ZW7-36 outdoor high-voltage vacuum circuit breaker is a kind of outdoor high-voltage switchgear under three-phase AC 50Hz, 36kv rated voltage and below. It can be used to switch on and off the loading, overloading and short-circuit current.

Features

1. Storage, making and breaking by motor, It can operating by handle.

2. Breaking short-circuit current up to 25kA.

3. Mini motor spring mechanism (about 30W).

4. Installation method: adopt two type installation method.

5. Sealing performance: adopt reliable sealing technical.

6. Incoming & Outgoing method: adopt silicon bushing to make enough insulate distance.

7. Safe operating: there is an equipment to protect explosion.

Technical Data

No. Item Unit Data
1 Rated voltage KV 36
2 Rated current A 1250,1600,2000
3 Rated short-circuit breaking current KA 20,25,31.5
4 Rated insulation level Power frequency withstand voltage Dry KV 95
Wet KV 80
Lightning impulse withstand voltage (peak value) KV 185
5 Rated operating sequence O-0.3s-CO-180s-CO
6 Rated capacitor group breaking current A 400
7 Rated short-circuit breaking current Time 20
8 Rated peak withstand current KA 50,63,80
9 Rated short – time withstand current KA 20,25,31.5
10 Rated Short-circuit Continuing Time S 4
11 Machinery life Time 10000
12 Permissible gross wearing thickness for dynamic/static contacts mm 3

See how orders move from review to dispatch.

Reception, production, testing and shipment areas are organized to keep technical requirements, work progress and delivery records aligned.
Workplace & Customer Reception

Workplace & Customer Reception

Visitors and project teams have a clear place to review requirements, drawings and delivery details before work moves forward.
Organized Production Lines

Organized Production Lines

Defined work areas and orderly material flow help teams keep assemblies, components and order information aligned.
Testing & Verification

Testing & Verification

Routine checks and functional verification are completed against approved requirements before release.
Shipment & Delivery

Shipment & Delivery

Finished orders are checked, protected and organized for traceable handover and coordinated dispatch.

Built for recognised standards

Our documentation package supports project review with internationally recognised safety, quality and environmental marks.

Technical files for your review

Access the latest catalogue, technical parameters and certification files before you finalise your specification.
Go to Download Center

Product questions, answered

Clear guidance on selection, documentation, customization and project delivery.
Please provide the application, system rated voltage and frequency, continuous load current, short-circuit level, insulation level or BIL, and the required operating duty. Also include indoor or outdoor installation, altitude, ambient temperature, pollution level, control voltage, communication requirements, quantity, destination market and applicable standard. A single-line diagram, existing nameplate or project specification will make the review more accurate.
Product Enquiry

Define the right product configuration

Share the application and commercial information available at this stage. Our team will review the request against the product range and identify any details still required for quotation.

Application data

Rated voltage, installation environment and operating duty.

Technical scope

Applicable standard, configuration and required documents.

Delivery planning

Estimated quantity, destination and requested schedule.

Project details

Complete the fields below and include any specification points already confirmed.
询盘表单